In this issue, I want to write about something that is dear to my heart. I call it the âinternal fix price modelâ and itâs about the way I like to think about projects.
If you take on a fixed-price project, you assume the riskânot the client. I find this to be a powerful way to approach projects, whether in consulting, client work, or leading an internal development team.
Letâs start with what most projects look likeâthe exact opposite of a fixed-price approach:
They exceed deadlines. They go over budget. They suffer from âmandatoryâ features being added long after commitment. They lack clear requirements. They have no well-defined acceptance criteria.
A fixed-price model eliminates these problems by enforcing strict boundaries.
To make it work:
No features can be added after the initial commitment - at least not without affecting the price. Every late addition is a liability that reduces profitability. Donât worry, of course change is inevitable - weâll address this in the next issue. Going over budget is, by definition, not an option.
This approach ensures predictability, profitability, and efficiencyâbut it requires discipline and clear agreements upfront.
Faster delivery = more profit
Think of your local pizza delivery guy. What if he found a way to deliver twice as many pizzas in the same time? Or better yetâwhat if he became so efficient that each delivery took half as long?
He could handle more orders. His tips would likely increaseâcustomers love fast service.
This principle applies directly to the Internal Fixed-Price Model. Fixed prices reward efficiencyâthe faster and more effectively you deliver, the more profitable you become.
Itâs a model worth striving for.
NO BIG DESIGN UPFRONT
Iâm not sure exactly when it started, but in the teams I worked with, it felt like a revolution against the Waterfall approach and the Big Design Upfront (BDUF) imposed by others.
We were tired of it.
Back then, teams were often treated as little more than code monkeysâtranslating requirements handed down by architects and requirement engineers into running code. No discussions, no real collaboration. We all know how that ended for most projectsânot well.
So when âNo Big Design Upfrontâ emerged, it felt like a relief. Finally, we could have real discussions and keep systems flexible over timeâto a certain extent.
But this shift had a clear downside: a lack of predictability and planning. Without a structured plan, we suddenly couldnât say, âWhen will this be done?â
I bought into it at the timeâbecause we became agile alongside it. The new mindset was simple:
Prioritize. Deliver the most important things by the deadline. You canât have it all. Sorry.
The plan
That simply doesnât work in a Fixed-Price Model.
The deal is clear: this price, all features, delivered on time. No excuses.
Imagine ordering 10 pizzas at your local pizza shop, paying for all of them, and then only getting 7 because the rest werenât ready in time. That would be unacceptableâand itâs no different in software.
A fixed-price commitment means delivering everything agreed upon, within the deadline. No surprises. No âwe ran out of time.â
How do we make this plan?
For a long time, this was a mystery to me.
I was always a fan of Event Storming, a collaborative modeling technique, but after the initial session, I often struggled to turn it into action. Thatâs when Event Modeling came into playâit was exactly what I had been looking for.
Event Modeling finally gave me âthe plan.â
I wonât go into the details hereâIâve been writing about it almost daily since January 2024.
Want to try it in your Team - I offer a 2-Day Workshop to apply this in your Team
But what I do want to show you is how Event Modeling enables us to create a solid plan, making internal fixed-price development possible.
To be clear, itâs not about whether you should use fixed prices. Itâs about having the ability to do itâif you had to.
First, plan the system in Slices. Want to know how that works in detail? Check the book, which describes the whole process.
Important, we also define the business rules per Slice using âGiven / When / Thensâ.
These slices are the key to everything.
They allow us to break the system into small, meaningful building blocks, making it easier to understand and implement. And the best part? We only need a handful of patterns to model the entire system:
State Change â How does information enter the system? State View â How does information leave the system?
With just these core patterns, we can map out the whole system efficiently.
These slices are incredibly powerful because they are independent of each otherâwhich means they can be planned and implemented separately. But how does that help?
Measuring Progress
Letâs say that after a few Event Modeling sessions, weâve modeled 4 workflows with 60 slices.
In a fixed-price model, we need to accurately estimate how long it will take to implement the system.
Workflows (which we call chapters) are marked with a blue arrow. Each workflow can contain any number of slices.
By breaking the system into these slices, we create a clear, measurable planâone that allows for accurate time estimates and ensures predictability in fixed-price development.
Slices are our unit of measurement.
Each slice is small enough to be implemented within a limited timeframeâtypically 1 to 2 days.
How Do We Know How Long a Slice Takes?
We measure.
For the first two sprints, we track how long it takes the team to implement slices. Letâs say we complete 10 slices in those two sprints. On average, it takes 2 days to build a production-ready slice.
Now, with 60 slices in total, we can estimate that implementing the 4 workflows will take 120 days. No Story Points, no abstract measurements - simple third-grade math.
Why is this important?
Early measurement is criticalâbut over time, as we complete more workflows and projects, we establish a default cycle time. This makes future planning even more predictable.
Instead of estimating with abstract sizes like story points - we use our default cycle time for slices.
Why does this work? because the Slices are small and follow the same 4 Patterns again and again, the implemenation is very often just a copy of a previous slice with little adjustments.
Change is inevitable
All fine - but change is inevitable. In a fixed price model, you need to be able to deal with change. What if we realize, that we forgot a few slices? What if for a new feature, some additional slices need to be added?
How do we deal with that?
This will be part of Issue #21 in this series about the âInternal Fixprice Modelâ.
Stay tuned!
Want to learn more about the process - the best way is to read the book and take the companion online course at the same time.
If you want to work with me, feel free to just send me a message on LinkedIn or simply reply to this E-Mail.
Have a nice day!